initial milestone in the development of water tourism was achieved with the completion of Connewitz lock, providing a continuous link between Leipzig and Lake Cospuden (Route 1).

The next key steps are the construction of a linking canal between the Pleisse and Lake Markkleeberg, and between Lakes Cospuden and Zwenkau. By 2022, the aim is for all routes and lakes in the south Leipzig New Lakeland to be usable as set out in the roadmap below.
ProjectScheduled completionBoat types
Route 1
Waterway linking Lake Zwenkau with Lake Cospuden, lock (Harth lock)from 2021Passenger ships, motorboats, sailing boats, canoes
Route 2
Waterway linking
Lindenau Harbour with Elster-Saale Canal
long termPassenger ships, motorboats, canoes
Route 3
Clearance of Old Elsterfrom 2017Passenger ships, motorboats, canoes
Clearance of Elster millrace
(east city harbour)
from 2018Passenger ships, motorboats, canoes
Route 4
Clearance of Elster millrace
(east city harbour)
from 2018Passenger ships, motorboats, canoes
Clearance of Old Elsterfrom 2017Passenger ships, motorboats, canoes
Waterway linking Elster millrace with Neue Luppefrom 2017Passenger ships, motorboats, canoes
Route 5
Connection between Lake Markkleeberg and the Pleisse,
lock (Markkleeberg "Water Snake")
from 2022Passenger ships, motorboats, canoes
Route 6
Percolation trench from Lake Hain to Rötha reservoir, locklong termPassenger ships, motorboats, canoes
Route 8a/8b
Waterway linking Lake Seelhausen with Lake Goitzschelong termPassenger ships, motorboats, sailing boats, canoes
Waterway linking Lake Seelhausen with Lake Goitzsche and Mulde reservoirlong termCanoes